Supply of 499 towers and additional materials to create a 260 km high-voltage electrical power line between Hassi Berkine and Nezla


For this project (in progress) for EUR REBO, ETE has identified the industrial partner, supervised production and organized delivery of 499 galvanized towers (35,000 tons) to the worksite of the overhead powerline linking Hassi Berkine to Nezla via Hassi Messaoud.

Additional materials (glass insulators, anchoring chains, junction boxes, etc.) shall be delivered as work advances in 2018.

For the production of these galvanized steel towers, ETE prepared technical and other specifications, wrote the invitation to tender, identified the industrial supplier in Turkey, and supervised industrial production, follow-up and delivery to the worksite, in 6 months.